Live stages, 80+ experts: talks, demos and Q&As

Saturday

11:00 AM – From Frozen, to Filtered, to Fresh
A lot has changed since Ireland’s first aesthetics clinic opened over two decades ago. Ireland’s OG aesthetic doctors share what we got wrong, what we’ve learned, and why modern full-face beautification delivers natural, undetectable results.
Panellists: Drs Katherine & Jane Mulrooney, Dr Edwina Buckley.

11:50 PM: The Science of Flawless Skin
What do the pros actually prescribe for perfect skin? A dermatologist,  plastic surgeon and laser specialist reveal the latest in regenerative topical creams, treatments and lasers they use with their own patients—so you can achieve your best skin ever.
Panellists: Consultant Dermatologist Clare Kiely,
Dr Amanda Hong, Prof Ali Ghanem

12:40 PM:  Body Confidence, Minus the Drama

 From lunchtime breast augmentation to minimally invasive body and intimate procedures, discover how rapid-recovery treatments safely address common concerns with less downtime and disruption.
Panellists: Prof Barry O’Reilly, Dr Ahmed Salman, Prof Ali Ghanem

1:30 PM: Rethinking Fillers: The Move Toward Natural Volume

Sculptra and skin boosters have quietly become the go-to for natural volume and youthful skin. Learn how these collagen-stimulating treatments are transforming modern aesthetics.
Panellists: Prof Caitriona Ryan, Mr Wojciech Konczalik,
Dr Sanna Askary

2:20 PM: The Bleph Boom: Are We Obsessed With Eyelids?
 Three leading eye surgeons discuss everything you need to know before committing to new eyes—from candidate suitability, techniques, and recovery, to why blepharoplasty has become the “it” tweakment for all ages.
Panellists: Mr Michael O’Rourke, Ms Clare Quigley,
Ms Nikolina Budimlija

3:00 PM – Calm The Chaos: Anxiety, Stress and Sleep
Finding it hard to switch off? Our panel explores practical strategies to ease anxiety, lift low mood and improve sleep. Discover how a blend of modern science, neuroscience insights, technology and timeless wellness techniques can help rebalance your nervous system, restore clarity and bring more calm to your daily life. Panellists: Dr Elisabetta Burchi, Dr Peter Prendergast and James McCauley.

Sunday

11:00 AM – What Works for Weight Management: Pills, Procedures, or a Smaller Plate?
From diets and injections to bariatric surgery, there’s no one-size-fits-all solution. Our expert panel breaks down the pros, cons, and realistic results of each approach—so you can find the strategy that truly works for your body and lifestyle.
Panellists: Dr Robert Kelly, Dr John Loy, Dr Ninnette De Clerke,

11:50 PM – New Skin, Who Dis? Laser Treatments Peeling Back the Years
From lines and pigmentation to scars and sagging, modern laser treatments can literally beam away years of skin concerns. Experts explain how advanced technologies—from radiofrequency to IPL—deliver results safely and effectively for smoother, brighter, youthful-looking skin.
Panellists: Kerry Hanphy RGN, Emma Ross RGN,
Dr Divviya Gautam

12:40 AM – Meno, Peri & Post-Pause: Solutions for Every Symptom (Well, Almost Every One!)
Our panel covers the blood tests you need, the conversations to have with your doctors, and real options—from supplements and HRT to non-invasive treatments—to navigate this life stage with confidence.
Panellists: Prof Mary Ryan, Dr Louise Fitzgerald, Anne Moriarty RGN, Dr Nasemma Morrad

1:30 PM – Hold the Scalpel: Non-Surgical Eye & Face Rejuvenation
Discover the latest non-surgical options—from bio-stimulating injectables to next-gen lasers—to restore, refresh, and rejuvenate your eyes and face.
Panellists: Prof Jack Kelly, Dr Isabell Haugh, Dr Alexander Ergün

2.10 Longevity: Can You Really Hack Ageing?
Cut through the hype with science-backed strategies—supplements, lifestyle tweaks, and cutting-edge research—to extend your healthspan, boost vitality, and live longer, healthier years.
Panellists: Prof Caitriona Ryan, Prof Nikki Ralph, Dr Sarah Jane Khong

2:40 PM – Confessions, Trends & Transformations: The New Plastic Surgery Era
After last year’s celebrity surgery confessions, two leading surgeons discuss the most popular procedures, emerging trends, what to expect, and who is suitable—insider guidance you need before committing.
Panellists: Dr Ali Arnaout, Dr Sami Hameid